Open Library - открытая библиотека учебной информации

Открытая библиотека для школьников и студентов. Лекции, конспекты и учебные материалы по всем научным направлениям.

Категории

Образование PRIMARY SHEAVE ENG
просмотров - 258

Do not remove the nut (clutch carrier) yet

NOTE:

Loosen the nut (clutch carrier) one turn using the lock- nut wrench Ø while holding the clutch carrier with the rotor holding

  Rotor holder: 90890-01235
Lock-nut wrench: 90890-01348

V- BELT, CLUTCH AND SECONDARY/

3. Remove:

• Clutch assembly Ø

• V-belt Ø

NOTE:

Remove the V-belt from the primary sheave side with clutch assembly

SECONDARY SHEAVE DISASSEMBLY

1. Remove:

• Nut Ø (secondary sheave)

NOTE:

Loosen the nut Ø while attaching the clutch spring compressor Ø and clutch spring holder arm Ø and release the compressed spring after removing the nut

  Clutch spring holder: 90890-01337
Clutch spring holder arm: 90890-01464

CLUTCH INSPECTION

1. Measure:

• Clutch shoe thickness

If scratched, glaze using coarse sandpaper If worn or damaged, replace

  Clutch shoe thickness: 2.0 mm
<Limit:1.5mm>

NOTE:

After using the sandpaper, clean off the polished par- ticles

Check the other clutch shoes Replace the three as a set


Читайте также


  • - PRIMARY SHEAVE ENG

    PRIMARY SHEAVE ENG G-1 V- BELT, CLUTCH AND SECONDARY/ CHECKING THE V-BELT 1. Check: • V-belt Ø Replace if worn, cracked, scaled or chipped Check primary and secondary sheaf for oil and grease 2. Measure • V-belt width Ø If not as specified, replace   V-belt width: 21 mm <Limit: 18.8 mm> CHECKING WEIGHT 1. Check: • Outside diameter of weights If cracked, worn, scaled or chipped, replace If not as specified,... [читать подробенее]


  • - PRIMARY SHEAVE ENG

    F-15 PRIMARY SHEAVE ENG CYLINDER AND PISTON ENG F-14 Use only new piston pin clips 3. Install: • Gasket (cylinder) New • Dowel pins 4. Position: • Piston rings NOTE: Offset the piston ring end gaps as shown §a Top ring end §b Oil ring end (lower) §c Oil ring (upper) §d 2nd ring end 5. Lubricate • Piston outer surface • Piston ring • Cylinder inner surface Engine Oil 6. Install: •... [читать подробенее]


  • - PRIMARY SHEAVE ENG

    1 3 2 PRIMARY SHEAVE ENG G-2 V-BELT, CLUTCH AND SECONDARY/ PRIMARY SHEAVE ASSEMBLY 5 41. Clean: • Primary sliding sheave face • Primary fixed sheave face • Collar • Weight • Primary sliding sheave cam face 3. Install: • Guide pins Ø 1 NOTE: Remove any excess grease 2. Install in the sliding sheave: • Weight • Collar NOTE: Apply grease No. (90890-69927) to all of the outside of... [читать подробенее]


  • - PRIMARY SHEAVE ENG

    Do not remove the nut (clutch carrier) yet NOTE: Loosen the nut (clutch carrier) one turn using the lock- nut wrench Ø while holding the clutch carrier with the rotor holding   Rotor holder: 90890-01235 Lock-nut wrench: 90890-01348 V- BELT, CLUTCH AND SECONDARY/3. Remove: • Clutch assembly Ø • V-belt Ø NOTE: Remove the V-belt from the primary sheave side with clutch assembly SECONDARY SHEAVE... [читать подробенее]